Folsom Dam Raise, USACE Sacramento District

Value Engineering for USACE Sacramento District

Overview

Folsom Dam, located on the American River, is operated by the Bureau of Reclamation. The 66-year-old concrete gravity dam regulates runoff and provides flood control protection, water supply, and hydropower for the Sacramento area.

This dam raise project increases flood storage and reduces downstream flood risk. The main dam will be retrofitted by raising eight floodgates, and the right- and left-wing earthen dams will be raised by building concrete floodwalls.

Highlights
  • OBJECTIVETo execute a 3.5-foot dam raise prescribed by Congress

The Objective

  • To increases dam safety for the entire region
3.5
foot dam raise
1875
square miles of drainage area

The Solution

  • The value study team developed 28 value proposals and 3 design suggestions with 12 accepted total
  • Improved dam operations, reliability, and maintainability of the system